Group 21 - John Deere Air-Cooled Chiller Supply

This project is sponsored by:

Our team created plans to reduce spill risk at the John Deere Harvester works facility by eliminating unnecessary piping and adapting infrastructure to operate with the proposed changes.

Project Details

Problem Statement

Team 21 was tasked with attending to the air-cooled-chilled-glycol system at the John Deere Harvester Works Facility in East Moline, IL. The chilled glycol system supplies several workstations around the facility, linked by a large piping network. As the

Project Presentation Video

Project Demonstration Video

This project is sponsored by:

Our team created plans to reduce spill risk at the John Deere Harvester works facility by eliminating unnecessary piping and adapting infrastructure to operate with the proposed changes.

Semester of Project: 

Spring 2023

Team Photo: 

Team Poster: 

Problem Statement/Summary: 

Team 21 was tasked with attending to the air-cooled-chilled-glycol system at the John Deere Harvester Works Facility in East Moline, IL. The chilled glycol system supplies several workstations around the facility, linked by a large piping network. As the

Project Department: 

SOET

Project Presentation Video Embed Code: 

Project Sponsor Website: 

https://www.deere.com/en/

Project Sponsor: 

john-deere1

Project Demo Video Embed Code: 

Team Contact: 

rojas17@purdue.edu