Our team created plans to reduce spill risk at the John Deere Harvester works facility by eliminating unnecessary piping and adapting infrastructure to operate with the proposed changes.
Spring 2023
Team 21 was tasked with attending to the air-cooled-chilled-glycol system at the John Deere Harvester Works Facility in East Moline, IL. The chilled glycol system supplies several workstations around the facility, linked by a large piping network. As the