Group 21 - John Deere Air-Cooled Chiller Supply

Our team created plans to reduce spill risk at the John Deere Harvester works facility by eliminating unnecessary piping and adapting infrastructure to operate with the proposed changes.

Presentation Video Link
Team Photo
Team Photo
Team Poster
Poster PDF.pdf632.57 KB
Problem Statement/Summary

Team 21 was tasked with attending to the air-cooled-chilled-glycol system at the John Deere Harvester Works Facility in East Moline, IL. The chilled glycol system supplies several workstations around the facility, linked by a large piping network. As the